More than worked as a transformer to provide the high voltage spark, Kavy’s experts also consider the good combustion, meeting emission targets and power starts with getting optimal arc, not only performance requirements, installation requirements but also environmental factors like pressure, temperature change, vibration and humidity etc.
Each coil development before production begins, starts with advanced simulation and modeling tools, Kavy’s engineering team develops and evaluates scores of alternatives before the final optimal design. We consider which raw materials to use could be the best, the layout of internal components, manufacturing feasibility, quality and performance requirements. Prototypes are produced for extensive testing as well as all evaluations. All performance and durability should be tested to achieve the design validation in our QC/T16-2016 lab. Only when premium reliability and performance is put through testing can our production begin.
Each coil development before production begins, starts with advanced simulation and modeling tools, Kavy’s engineering team develops and evaluates scores of alternatives before the final optimal design. We consider which raw materials to use could be the best, the layout of internal components, manufacturing feasibility, quality and performance requirements. Prototypes are produced for extensive testing as well as all evaluations. Only when premium reliability and performance is put through testing can our production begin.